Jan 27, 2022 Leave a message

Q & A for Core Drilling -Wireline Coring 3 Core Drilling Equipment -Drilling Rig

Core Drilling Equipment-Drilling Rig


1. Which are the disadvantages of a mechanical core drill as compared to a hydraulic core drill?

* Very bad control of the rpm

* Bad control of the feed force

* Extremely bad rod handling


2. What limits the depth capacity of a core drill?

* The drill rigs lifting force

* The torque


3. Which are the main components of an underground core drill?

* Feed frame

* Rotation head

* Rod holder

* Skid frame with positioning arm

* Wire-line winch

* Control panel

* Power unit


4. Describe the advantages of APC drilling as compared to manual drilling.

* Supervision of all drilling parameters:

- Less risk for getting stuck with the drill string

- Better penetration rate and bit life

- Less hole deviation

* Drilling during breaks

- Higher productivity

- Possibility for one-man operation

- Lower drilling costs.


5. Which are the advantages, from a driller point of view, with a long feed stroke as compared to a short feed stroke?

* Less re-chucking operations

* Less risk for a core blockage


6. Describe the function of a mechanized rod handling system on an underground core drill.

* The rotation head is in its front position on the feed frame

* The chuck closes and grips the drill rods while the rod holder opens.

* The feed cylinder makes a full backward stroke placing the rotation head in its rear position on the feed frame.

* The rod holder closes and grips the drill rods while the chuck opens and releases the drill rods.

* The feed cylinder makes a full forward stroke returning the rotation head to its front position on the feed frame.

* Point 1 – 5 is repeated until a threaded coupling is placed in between the chuck and the rod holder.

* The chuck as well as the rod holder grips a drill rod on each side of the threaded coupling.

* The chuck is rotated clockwise until the thread is opened.

* The lose drill rod is manually lifted from the feed frame to the rod rack.


7. Why is a rigid set up especially important for core drills?

* To avoid harmful vibrations

* For a correct alignment of the core drill.


Source: https://www.cgegtech.com/

Geo Equip Tech Wuxi, CGET Wuxi

*Without permission, it cannot be reproduced, and the source of the reprint must be indicated.*


Send Inquiry

whatsapp

Phone

E-mail

Inquiry